Rakuda2 path
Hardware-verified
The order from bringing up Rakuda2 through collection, training and inference. Stages 1–4 of Stages of bringing up a robot correspond to "Configuration and read check", and stage 5 to "Teleoperated collection".
| Order | Page | Content |
|---|---|---|
| 1 | Configuration and read check | Create the configuration, read the ports, and go once through the path with the torque off |
| 2 | Gravity compensation | Measure the zero points, the range of motion and the gravity model, and tune the leader's compensation |
| 3 | Teleoperated collection | Drive with the leader and record together with the RealSense and DIGIT |
| 4 | From collection to inference | Go through checking, training with LeRobot, inference and recording success |
| 5 | Evaluating with interventions | Take over from the policy with the leader partway, and record the intervened rows separately |
To try it first without devices, start from First run without devices.